

Searching in stories... |
TimelineShow all
|
Options
|
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
Show the latest entries |
||
Searching in stories... |
TimelineShow all
|
The Bombardier CSeries (officially BD-500-1A10 for the CS100 and BD-500-1A11 for the CS300) is a family of narrow-body, twin-engined, medium-range airliners developed by the Canadian manufacturer Bombardier Aerospace. Since July 2018 it has been built and marketed by Airbus as the Airbus A220, the CS100 becoming the A220-100 and the CS300 the A220-300.
The CS100, seating 108 to 133 passengers, first flew on 16 September 2013, received its Transport Canada type certificate on 18 December 2015 and entered service with Swiss on 15 July 2016. The larger CS300, with 130 to 160 seats, first flew on 27 February 2015, was certified on 11 July 2016 and entered service with its launch customer, airBaltic, on 14 December 2016.
Bombardier's interest in aircraft of more than 100 seats goes back to the mid-1990s. When Fokker, maker of the 100-seat Fokker 100, ran into difficulties, Bombardier opened talks with the Dutch manufacturer on 5 February 1996, but gave up the idea of buying it on 27 February; Fokker was declared bankrupt on 15 March.
On 8 September 1998 Bombardier launched the BRJ-X (Bombardier Regional Jet eXpansion), a regional jet larger than the Canadair Regional Jet, due to enter service in 2003. Instead of the 2+2 seating of the CRJ, it was to have a wider fuselage with 2+3 seating for 85 to 110 passengers, and engines mounted under the wing. It would have competed with the smallest narrow-body airliners, such as the DC-9, MD-80 and Boeing 717 family, the Airbus A318 and the Boeing 737-500/600. At the end of 2000 Bombardier shelved the project in favour of a cheaper stretch of the CRJ700 into the CRJ900. Meanwhile Embraer launched its four-abreast E-Jets for 70 to 122 passengers at the Paris Air Show in June 1999, and Airbus launched the A318, a shortened A319 for 107 to 117 passengers, in April 1999.
In March 2004 Bombardier appointed Gary Scott to evaluate a new commercial aircraft programme, and in July 2004, at the Farnborough Airshow, it announced a feasibility study for a five-abreast aircraft, the CSeries. It was intended to replace ageing DC-9s and MD-80s, Fokker 100s, Boeing 737 Classics and BAe-146s, with operating costs 20% lower than those aircraft and 15% lower than new aircraft of the time. Two versions were planned: a C110 for 110 to 115 passengers and a C130 for 130 to 135 passengers, with a range of 3,200 nautical miles.
The board authorised marketing on 15 March 2005. The aircraft was to have 3+2 economy seating, four-abreast business class, fly-by-wire controls with side-sticks and about 20% of its structure in composite materials, with a first flight in 2008 and entry into service in 2010. In May 2005 development was estimated at 2.1 billion US dollars, shared in equal thirds between Bombardier, its suppliers and the governments of Canada, Quebec and the United Kingdom. The British contribution was linked to the production of the wings, nacelles and composite tail structures at the Belfast plant of Short Brothers, bought by Bombardier in 1989.
On 31 January 2006, however, Bombardier announced that market conditions did not justify launching the programme and redirected most of the team to its regional jets and turboprops, keeping only a small group to refine the business plan.
Work resumed in January 2007 with entry into service now planned for 2013. In November 2007 Bombardier selected the Pratt & Whitney geared turbofan, now the PW1000G, which had also been chosen for the Mitsubishi Regional Jet, as the exclusive engine of the CSeries. The gearbox between the fan and the low-pressure turbine allows both to turn at their optimum speeds, promising about 12% lower fuel burn than the engines of the time and much less noise.
On 13 July 2008, on the eve of the Farnborough Airshow, Bombardier formally launched the CSeries, backed by a letter of interest from Lufthansa for up to 60 aircraft, 30 of them options, at a list price of 46.7 million dollars. Final assembly was to take place at Mirabel, near Montreal; the wings would be built in Belfast, the rear fuselage and cockpit at Bombardier's Saint-Laurent plant in Montreal and the centre fuselage in China by Shenyang Aircraft Corporation, a subsidiary of AVIC. Bombardier estimated the market for 100 to 149-seat aircraft at 6,300 units over twenty years and hoped to win up to half of it. The cost of the programme was revised to 3.5 billion dollars in November 2009.
The CSeries was designed from scratch rather than derived from an existing aircraft. About 70% of its structure is made of advanced materials, 46% composites and 24% aluminium-lithium alloy, a proportion close to that of wide-bodies such as the Boeing 787 and Airbus A350 XWB. Combined with the new engines, this was intended to give 20% lower fuel burn and 15% lower operating costs per seat than comparable aircraft, a 25% reduction in maintenance costs and a noise footprint four times smaller.
The cabin was designed with passenger comfort in mind: the five-abreast layout leaves only one middle seat per row, and the seats, armrests and aisle are wider than in most narrow-body aircraft. Every row has a large window, and large rotating overhead bins allow each passenger to stow a sizeable bag. The cockpit uses the Rockwell Collins Pro Line Fusion avionics with large 15-inch screens.
By June 2009, 96% of the aircraft's components had been allocated to suppliers. Among them were Alenia Aeronautica for the composite horizontal and vertical stabilisers, Fokker Elmo for the wiring, Shenyang Aircraft Corporation for the centre fuselage, Zodiac Aerospace for the interior, Parker Hannifin for the flight control, fuel and hydraulic systems, Liebherr Aerospace for the air management system and United Technologies for the air data system, the flap and slat actuation and the engine nacelles. The composite wings are built in a purpose-built factory in Belfast, Northern Ireland, where a section of the fuselage is also produced.
In March 2009 the C110 and C130 were renamed CS100 and CS300. Extended-range (ER) versions and an extra-thrust (XT) CS300 were offered until 2012, when Bombardier simply made the extended range standard. In 2012 discussions with AirAsia led to a high-density, 160-seat version of the CS300 with an additional pair of overwing exits; AirAsia did not order it at the time, but the layout was added to the programme. In 2015 Bombardier studied a further stretch, the CS500, intended to compete with the core versions of the Boeing 737 and Airbus A320.
The schedule slipped repeatedly. In November 2012 Bombardier announced a six-month delay due to supplier problems, putting the first flight back to mid-2013; the PW1500G engine, the CSeries version of the PW1000G, was certified by Transport Canada on 20 February 2013.
The first flight test vehicle (FTV1) was shown almost complete in March 2013. After further delays for software updates and systems integration, Transport Canada issued the flight test permit on 30 August 2013, and the CS100 made its maiden flight from Mirabel on 16 September 2013. In January 2014 entry into service was delayed again, to the second half of 2015, because of difficulties with certification testing.
On 29 May 2014 one of the test aircraft suffered an uncontained engine failure during a ground test. Flight testing was suspended for more than three months, keeping the aircraft away from the 2014 Farnborough Airshow, and Bombardier cut its workforce and changed the programme's management. Flights resumed on 7 September 2014 after the fault had been traced to the engine's lubrication system. These delays led to the cancellation of several orders, including those of the Swedish company Braathens Aviation.
The CS300 made its first flight from Mirabel on 27 February 2015. At the Paris Air Show in June 2015 Bombardier published performance figures better than its original guarantees. The CS100 completed its certification tests in November 2015 and received its type certificate from Transport Canada on 18 December 2015. By then the development cost had reached 5.4 billion dollars.
Delays, cost overruns and orders that were slow to come put Bombardier in a difficult position. In October 2015 Airbus confirmed that it had turned down an offer to take a majority stake in the programme. On 29 October 2015 Bombardier announced a write-down of 3.2 billion dollars on the CSeries, and the Quebec government agreed to invest 1 billion US dollars in exchange for 49.5% of the programme. After long negotiations, the federal government of Canada announced in February 2017 a support package of 372.5 million Canadian dollars in interest-free loans.
The CS100 received its FAA and EASA certification in June 2016. The first aircraft was delivered to Swiss on 29 June 2016 at Mirabel, and revenue service began on 15 July 2016 with a flight from Zurich to Paris. Swiss soon reported a reliability much higher than that of other new aircraft, and praise from passengers for the bright, quiet cabin and from pilots for the intuitive handling. The main problems in the early months were spurious avionics messages and the long start-up time of the PW1500G engines.
The CS300 was certified by Transport Canada on 11 July 2016, and on 23 November 2016 EASA and Transport Canada approved a common type rating allowing pilots to fly both versions. The first CS300 was delivered to airBaltic on 28 November 2016 and entered service on 14 December 2016 on the Riga to Amsterdam route, the same day it was validated by the FAA. airBaltic reported a fuel consumption of 2,600 litres per hour, against 3,000 litres for its Boeing 737-300s of similar capacity. In April 2017 the CS100 was certified for the steep approaches required at London City Airport, where it became the largest aircraft to operate.
The CS100 competes with the Embraer E195-E2, and the CS300 with the Boeing 737 MAX 7, the Airbus A319neo and the Irkut MC-21-200. Competition was fierce: in January 2016 United Airlines chose 40 Boeing 737-700s, reportedly at a very steep discount, rather than the CS300.
The turning point came in 2016. On 17 February Air Canada signed a letter of intent for 45 CS300s with 30 options, finalised in June. On 28 April Delta Air Lines ordered 75 CS100s with 50 options, the largest order in the programme's history, reportedly at a heavy discount on the list price.
On 27 April 2017 Boeing filed a complaint in the United States accusing Bombardier of dumping, claiming that the aircraft had been sold to Delta at 19.6 million dollars each, below a production cost estimated at 33.2 million. Delta replied that Boeing had not even offered a competing new aircraft. The U.S. Department of Commerce proposed combined duties of 292% in December 2017, but on 26 January 2018 the U.S. International Trade Commission unanimously ruled that Boeing had not been harmed, and no duties were imposed; Boeing did not appeal.
On 16 October 2017 Airbus and Bombardier announced a partnership under which Airbus would take a 50.01% stake in the programme without paying for it or assuming any debt. The agreement took effect on 1 July 2018, and on 10 July 2018 the CSeries was renamed Airbus A220, with the CS100 and CS300 becoming the A220-100 and A220-300. Headquarters and the main assembly line remained at Mirabel. In February 2020 Bombardier sold its remaining share, and Airbus now holds 75% of the programme, the remaining 25% belonging to Investissement Québec.
To serve American customers, and to avoid future trade disputes, Airbus built a second final assembly line in Mobile, Alabama, where production began in August 2019; the first American-assembled A220 was delivered to Delta in October 2020. Delta has become the largest operator of the type, alongside airBaltic, Air Canada, JetBlue, Swiss and Breeze Airways. In May 2026 AirAsia ordered 150 A220-300s, becoming the largest customer by number of aircraft ordered. By October 2026, more than 1,100 A220s had been ordered and 559 delivered.
The PW1500G engines have remained a weak point, with in-flight shutdowns in 2019 and durability problems with the combustion chamber that led several airlines to ground aircraft in 2023. A stretched version, first studied as the CS500 and then as the A220-500, was still under study by Airbus in 2026.
— — — = = — — —
| CS100 (A220-100) | CS300 (A220-300) | |
|---|---|---|
| Cockpit crew | 2 pilots | |
| Passengers | 108 (8F + 100Y) to 133 (1-class) | 130 (12F + 118Y) to 160 (1-class) |
| Seat pitch | 28 in (71 cm) in max. density to 36 in (91 cm) in 2-class |
28 in (71 cm) in max. density to 38 in (97 cm) in 2-class |
| Seat width | 18.5 in (47 cm) to 20 in (51 cm) | |
| Length | 114 ft 9 in / 35.0 m | 127 ft 0 in / 38.7 m |
| Wingspan | 115 ft 1 in / 35.1 m | |
| Wing Area | 1,209 sq ft / 112.3 m² | |
| Height | 37 ft 8 in / 11.5 m | |
| Fuselage diameter | 12 ft 2 in / 3.7 m | |
| Cabin width | 129.0 in / 3.28 m | |
| Cabin height | 83.0 in / 2.11 m | |
| Cabin length | 77 ft 10 in / 23.7 m | 90 ft 1 in / 27.5 m |
| Cargo volume | 838 cu ft / 23.7 m³ | 1,116 cu ft / 31.6 m³ |
| MTOW | 134,000 lb / 60,781 kg | 149,000 lb / 67,585 kg |
| MLW | 115,500 lb / 52,390 kg | 129,500 lb / 58,740 kg |
| Maximum Zero Fuel Weight | 111,000 lb / 50,349 kg | 123,000 lb / 55,792 kg |
| Maximum cargo | 8,000 lb / 3,629 kg | 10,700 lb / 4,853 kg |
| Maximum payload | 33,350 lb / 15,127 kg | 41,250 lb / 18,711 kg |
| Operating Empty Weight | 77,650 lb (35,221 kg) | 81,750 lb (37,081 kg) |
| Fuel capacity (a) | 38,875 lb / 17,630 kg | 37,950 lb / 17,213 kg |
| Maximum range | 3,100 nmi / 5,741 km (b) | 3,300 nmi / 6,112 km |
| Cruise speed, maximum | Mach .82 (470 kts; 871 km/h; 541 mph) | |
| Cruise speed, typical | Mach .78 (447 kts; 829 km/h; 515 mph) | |
| Take off run at MTOW | 4,800 ft / 1,463 m | 6,200 ft / 1,890 m |
| Landing field length at MLW | 4,550 ft / 1,387 m | 4,950 ft / 1,509 m |
| Service ceiling | 41,000 ft / 12,497 m | |
| Engines | 2× Pratt & Whitney PW1500G | |
| Fan diameter | 73 in (185 cm) | |
| Thrust per Engine | PW1519G (CS100) : 18,900 lbf / 84.1 kN PW1521G : 21,000 lbf / 93.4 kN PW1524G : 23,300 lbf / 103.6 kN PW1525G : 23,300 lbf / 103.6 kN |
|
— — — = = — — —
|
|
You choosed to show only the famous things! (Via the Options menu)
The comments below concern only this page (CSeries).
For a general question or remark about aircraftube, please use the general blog.