The Boeing 787 Dreamliner is a long-range, twin-engined wide-body airliner developed by Boeing Commercial Airplanes. Its three versions seat about 210 to 330 passengers. It was the first major airliner built mainly of composite materials, which account for about half of its structural weight, and was designed to burn about 20% less fuel than the 767 it was intended to replace. Its distinctive features include largely electrical systems in place of engine bleed air, a four-panel windscreen, serrated "chevron" engine nacelles to reduce noise, raked wingtips and large electronically dimmable windows. It shares a common type rating with the larger 777.
Launched in April 2004 under the designation 7E7, the 787 suffered more than three years of delays: originally due to enter service in May 2008, it first flew on December 15, 2009, was certified in August 2011 and entered service with All Nippon Airways (ANA) on October 26, 2011. Its early career was marked by battery fires that led to the worldwide grounding of the fleet from January to April 2013, and later by manufacturing quality problems that halted deliveries almost completely between 2021 and 2022. By August 2026, 2,466 had been ordered and 1,303 delivered. The crash of Air India Flight 171 on June 12, 2025 was its first fatal accident and its first hull loss.
In the late 1990s, as sales of the 767 and the 747-400 slowed, Boeing studied two new aircraft: the 747X, a stretched and improved 747, and the Sonic Cruiser, which would have flown about 15% faster than existing airliners (around Mach 0.98) while burning fuel at the rate of a 767. Interest in the 747X was lukewarm, and the Sonic Cruiser initially aroused the enthusiasm of several American airlines, including Continental. But the September 11, 2001 attacks and rising oil prices led airlines to prefer efficiency to speed, and Boeing cancelled the Sonic Cruiser on December 20, 2002. On January 29, 2003, it announced in its place a more conventional aircraft using some of its technologies, the 7E7 (development code name Y2), first stage of the Yellowstone project intended to renew the entire Boeing range. The choice of a medium-sized twinjet rather than an aircraft the size of the 747 reflected Boeing's bet on point-to-point long-haul routes, avoiding connections at hubs, in contrast to Airbus, which was developing the very large A380. The "E" was variously said to stand for efficiency or environment, but Boeing finally stated that it simply meant "eight". In July 2003 a public naming contest, with some 500,000 votes, chose the name Dreamliner.
On April 26, 2004, ANA became the launch customer with a firm order for 50 aircraft, worth about 6 billion dollars: 30 short-range, high-capacity 787-3s for Japanese domestic routes and 20 long-range 787-8s. On April 6, 2004, Boeing had selected two engines, the General Electric GEnx and the Rolls-Royce Trent 1000, with a common interface allowing either to be fitted; Pratt & Whitney's proposal was not retained. The 787 was to be about 20% more economical than the 767, roughly 40% of the gain coming from the engines and the rest from aerodynamics, composite materials and new systems. Aerodynamic development involved extensive wind tunnel testing in the United States, the United Kingdom and at the French ONERA, and the final shape was more conventional than the early concepts, which had a drooped nose and a "shark fin" tail. By the end of 2004 orders and commitments totalled 237 aircraft, attracted by an initial price of about 120 million dollars for the 787-8, low enough to surprise the industry, and by large discounts for early customers. In response, Airbus first proposed a modified A330, then designed an entirely new aircraft largely made of composites, the A350 XWB.
The 787 was the first airliner whose fuselage was assembled from one-piece composite barrel sections, instead of aluminium sheets held by some 50,000 fasteners. On December 16, 2003 Boeing chose its Everett plant for final assembly, where 800 to 1,200 people were to join complete sub-assemblies delivered with their systems already installed, reducing final assembly to three days. About 80% of the work was subcontracted, with unprecedented responsibility given to suppliers in about ten countries. Japanese companies designed and built some 35% of the aircraft, including the wings, for the first time entrusted to outside firms (Mitsubishi Heavy Industries built the wing box), and Kawasaki and Fuji other major sections; Alenia Aeronautica in Italy and Korea Aerospace Industries built the horizontal stabiliser; fuselage sections came from Global Aeronautica in Italy, Vought in North Charleston, Kawasaki, Spirit AeroSystems in Wichita and Korean Air; the passenger doors were built by Latécoère in France and the wiring by Labinal, also French; Saab built the cargo doors, Messier-Bugatti-Dowty the landing gear and Hamilton Sundstrand the electrical and air conditioning systems. The carbon fibre came from the Japanese company Toray. To transport these large components, Boeing converted four 747-400s into 747 Dreamlifters.
The first 787 was presented at Everett on July 8, 2007 (7/8/7 in American date format), by which time it had received 677 orders, more than any previous wide-body before its rollout. However, the aircraft was largely an empty shell, held together with temporary fasteners. Suppliers, struggling to obtain parts and complete their share of the assembly, left much unfinished work for Boeing to complete at Everett. On September 5, 2007 Boeing announced a first three-month delay, blaming a shortage of fasteners and incomplete flight control software; in October 2007 a second delay was announced and the programme manager was replaced; a third followed in January 2008, then a fourth in April 2008, which put first deliveries back to the third quarter of 2009. In November 2008 a fifth delay was attributed to incorrectly installed fasteners and to a strike by the machinists. To regain control of its supply chain, Boeing bought Vought's share in Global Aeronautica and then Vought's North Charleston factory in 2009.
The first aircraft were also overweight: in December 2006 Boeing acknowledged that the first six 787s would be overweight, the first by some 5,000 lb (2,300 kg), and early aircraft were expected to have a range about 10–15% lower than promised. In June 2009, shortly after announcing at the Paris Air Show that the first flight would take place within two weeks, Boeing postponed it again because the wing-to-fuselage join needed reinforcing. Boeing wrote off 2.5 billion dollars, considering the first three aircraft, suitable only for flight testing, to be unsaleable. On October 28, 2009 it chose North Charleston, South Carolina, as the site of a second final assembly line.
The 787 made its first flight on December 15, 2009, from Paine Field at Everett to Boeing Field in Seattle, a flight shortened from four to three hours by bad weather. The test programme used six aircraft, four with Trent 1000 engines and two with GEnx engines. In March 2010 the wings were loaded to 150% of their design limit load, flexing about 25 ft (7.6 m) upwards. The 787 made its international air show debut at Farnborough in July 2010. On August 2, 2010, a Trent 1000 failed during a ground test at Rolls-Royce, delaying the first delivery to ANA to early 2011. On November 9, 2010, the second test aircraft, ZA002, made an emergency landing at Laredo, Texas, after an electrical fire caused by foreign object debris left in an electrical bay; testing was suspended until late December, and the first delivery slipped to the third quarter of 2011. After 4,828 hours in 1,707 flights, the 787-8 was certified by the FAA and EASA on August 26, 2011, at a ceremony at Everett.
The first 787 was delivered to ANA on September 25, 2011. On October 26, 2011 it flew its first commercial service, from Tokyo Narita to Hong Kong, more than three years later than originally planned; seats were auctioned online, the highest bid reaching 34,000 dollars. The first long-haul flight, Tokyo Haneda–Frankfurt, took place on January 21, 2012. ANA reported that the 787 burned 21% less fuel than the 767 on this route. In December 2011 a test aircraft flew 10,710 nmi (19,830 km) non-stop from Seattle to Dhaka, a distance record for aircraft of its weight class. The first 787 assembled at North Charleston was rolled out in April 2012 and delivered to Air India on October 5, 2012. The early aircraft, however, remained heavier than planned, which forced ANA to restrict its first examples to shorter routes.
In January 2013 a series of incidents affected the new aircraft, the most serious being a lithium-ion battery fire on a Japan Airlines 787 parked at Boston on January 7, followed on January 16 by the emergency landing of an ANA 787 after smoke from its main battery. The same day, the FAA issued an emergency airworthiness directive grounding all American 787s, and the authorities of Europe, Japan, India and Chile followed suit: the entire fleet was grounded worldwide. After testing a redesigned battery system, with better insulated cells and a steel containment box vented to the outside, the FAA approved the modifications on April 19, 2013 and lifted the grounding on April 26; Ethiopian Airlines resumed passenger flights the next day. Other incidents followed in 2013, including a fire on an Ethiopian Airlines 787 parked at London Heathrow in July, caused by the battery of an emergency locator beacon.
The 787-3, ordered only by ANA and JAL, was cancelled in December 2010. The 787-9, stretched by 20 ft (6.1 m) and with a longer range, first flew on September 17, 2013; Air New Zealand received the first example on July 8, 2014 and flew its first commercial service, Auckland–Sydney, on August 9, 2014. In March 2018, Qantas used it to open the first scheduled non-stop route between Australia and Europe, Perth–London (14,484 km), and in March 2020 Air Tahiti Nui flew Papeete to Paris non-stop (15,715 km), the longest scheduled commercial flight in history at that time. The 787-10, launched at the 2013 Paris Air Show and stretched by a further 18 ft (5.5 m), first flew in March 2017 and entered service with Singapore Airlines on April 3, 2018; built only at North Charleston, it trades range for capacity. In March 2026 the FAA approved higher maximum take-off weights for the 787-9 and 787-10, adding about 400 nmi of range or six tonnes of payload.
Boeing increased production from 2 to 10 aircraft a month by 2014, then to 12 in 2016 and 14 in 2019, but the programme long remained costly: Boeing spent some 32 billion dollars on it, and accumulated deferred production costs exceeded 25 billion dollars before the aircraft began to earn money. In March 2014, defects caused by missing shims in the wings built by Mitsubishi required the inspection of 42 aircraft. The COVID-19 pandemic led Boeing to cut production to five a month and, on October 1, 2020, to announce the consolidation of all 787 assembly at North Charleston from 2021, ending production at Everett.
At the same time, manufacturing defects were discovered, notably gaps between fuselage sections and improperly installed shims. Deliveries were almost completely halted from late 2020, the FAA withdrew Boeing's authority to certify new 787s itself, and only 14 aircraft were delivered between November 2020 and August 2022; deliveries resumed on August 10, 2022, after the FAA approved Boeing's inspection and repair procedures. In January 2023 Boeing reported 6.3 billion dollars in abnormal costs, and the rework of about 120 stored aircraft was not completed until February 2025. In April 2024 an engineer, Sam Salehpour, alleged that some fuselage sections had been improperly assembled; Boeing rejected the claims, and the FAA opened an investigation. In 2026 the North Charleston plant was building about eight aircraft a month, with a target of 10, and Boeing was building a second final assembly line there, planned for 2028 to allow further increases; supplies of engines and seats nevertheless limited deliveries, with Boeing aiming for 90 to 100 deliveries that year.
The 787 is 80% composite by volume; by weight, Boeing lists its materials as 50% composites, 20% aluminium (on the leading edges of the wings and tail), 15% titanium, 10% steel and 5% other materials. Its cruise speed is Mach 0.85 (about 900 km/h). Composites, which conduct electricity up to a thousand times less well than aluminium, required conductive materials to be added to protect the aircraft against lightning strikes.
The main innovation is the electrical architecture. The 787 has no bleed air system: the cabin pressurisation, wing ice protection (electrically heated mats on the slats), engine starting, stabiliser trim and wheel brakes are all electrically powered. Boeing states that the system draws 35% less power from the engines than conventional systems; the generators supply a total of 1.45 megawatts, five times more than on conventional airliners. An active gust alleviation system, similar to that of the B-2 bomber, improves ride comfort in turbulence. The fly-by-wire flight controls are similar in architecture to those of the 777, and the cockpit has large liquid-crystal displays and two head-up displays as standard, while retaining Boeing's traditional control yokes.
For passengers, the composite fuselage allows a cabin altitude of 6,000 ft (1,800 m) instead of 8,000 ft (2,400 m) on earlier aircraft, together with higher humidity, which reduces fatigue and headaches. The windows, about 65% larger than on other airliners, have no blinds: passengers darken them electronically, through five levels of opacity. The engines' chevron nacelles and other improvements reduce the noise footprint by about 60%, and Boeing claims 20% lower CO2 emissions. Several engine durability problems affected the Trent 1000, which required the grounding of a number of aircraft for inspections in the late 2010s.
787-8
The original version, 186 ft (56.7 m) long, seats about 240 passengers in two classes and has a range of about 7,305 nmi (13,530 km). It replaced the 767-200ER and 767-300ER and opened new long, thin routes. Its share of orders has fallen as airlines have preferred the larger versions.
787-9
Stretched by 20 ft (6.1 m), the 787-9 seats about 290 passengers with the longest range of the family, about 7,565 nmi (14,010 km). It has become the best-selling version.
787-10
The longest version, 224 ft (68.3 m), seats about 330 passengers but has a shorter range, about 6,330 nmi (11,730 km), intended for high-density medium and long-haul routes. It has always been assembled only at North Charleston.
The 787-3, a short-range version with a reduced wingspan for Japanese domestic routes, was cancelled in 2010 before being built.
Apart from the battery fires of 2013, the 787 experienced numerous incidents in its first years, including electrical failures, fuel leaks and engine icing in the vicinity of thunderstorms, which led Boeing in November 2013 to advise operators to keep away from storms that might contain ice crystals. On March 11, 2024, a LATAM 787 suddenly dived during a flight from Sydney to Auckland, injuring some 50 people; the incident was attributed to the unintended movement of a pilot's seat.
On June 12, 2025, Air India Flight 171, a 787-8 bound for London Gatwick, crashed into a residential area of Ahmedabad, India, a few seconds after take-off, killing 241 of the 242 people on board and 19 people on the ground. It was the first fatal accident and the first hull loss of a 787. The preliminary report published on July 12, 2025 by the Indian Aircraft Accident Investigation Bureau found that both engine fuel control switches had moved from "RUN" to "CUTOFF" within about one second shortly after take-off, cutting off fuel to both engines; it made no recommendation to Boeing or to operators. In July 2026, the Indian government stated that tests had found no defect in the switches; the final report, which was to determine how the switches had been moved, had not yet been published.
— — — = = — — —
— — — = = — — —
|
|
You choosed to show only the famous things! (Via the Options menu)
The comments below concern only this page (787 Dreamliner).
For a general question or remark about aircraftube, please use the general blog.